Our Plant

Installation

Step 1: Pre-Installation Preparation

✔ Clean Environment: Work in ISO Class 8 (or cleaner) workspace
✔ Tool Checklist:

Precision torque wrench (0.1-5 Nm range)

Non-metallic drift punch

Cryogenic gloves (for cold mounting)

Dial indicator (for runout verification)

Figure 2: Microscope image showing contaminated vs. properly cleaned bearing raceway

Step 2: Thermal Mounting (Recommended Method)

Heat Shaft: 80-100°C (176-212°F) for 30 mins
Caution: Never exceed 120°C (248°F)

Cool Bearing: -30°C (-22°F) for 15 mins (optional)

Quick Assembly: 10-second window for alignment

Figure 3: Thermal expansion graph with optimal installation temperature zone highlighted

Step 3: Precision Alignment

Use 0.001mm resolution dial indicator to verify:

Radial runout <0.005mm

Axial wobble <0.003mm
Laser alignment recommended for <15mm bore sizes

Figure 4: Animated GIF showing proper vs. misaligned installation

Step 4: Torque Sequencing

Cross-Tighten mounting screws in 3 stages:
① 30% torque → ② 70% torque → ③ 100% torque

Pattern: Follow star sequence (see diagram)

*Figure 5: Color-coded torque sequence diagram with directional arrows*

Post-Installation Verification

✔ Rotation Test: Hand-spin should show:

Smooth motion (no stick-slip)

Uniform resistance (<0.05 Nm variation)
✔ Vibration Analysis: <0.5 mm/s RMS vibration

Popular Products

  • If you need OEM bearing, contact us now!

    Learn More
  • YRT Bearing ZKLDF

    In the realm of mechanical engineering, bearings play a crucial role in facilitating smooth motion and reducing frict...

    Learn More